4/22/2013 GRP
4/27/2013 IRP first draft OR IRP Source Matrix + Source Synthesis Outline** Due by 12:00 pm.
5/6/2013 IRP final draft. Due by 5:00 pm.
*For the GRP Annotated Bibliography, turn in 1 full summary (of "Foreign Aid Faces Major Cutbacks"), 2 relevancy statements, 3 reliability statements, and 3 ciations of sources.
**On April 27th, you can either turn in:
(1) an IRP First Draft WITH an IRP Source Matrix + Source Synthesis Outline
OR
(2) an IRP Source Matrix + Source Synthesis Outline alone.
If you turn in an IRP First Draft, I will be able to give you more feedback in our conference. If you turn in an IRP Source Matrix + Source Synthesis Outline alone, it MUST be very detailed, clean, and well-thought out. An outline with a few sentences added to it is NOT acceptable and will not receive a passing grade.
The more work you do early, the better your life will be!
IRP Source Synthesis Matrix
IRP Source Synthesis Outline Template
No comments:
Post a Comment